Odiseja 97

PRODUCTION

In-house manufacturing since 1997.

We produce in our own plant in Čitluk. Cutting, filling, sewing and packaging — all done in-house.

The numbers behind every product

7,000 m²
production area
18,000 m²
warehouse
100+
employees

MONTHLY CAPACITY

What we produce every month

🛏️
40,000
pillows / month
🛌
20,000
quilts / month
🧺
20,000
throws / month
🛡️
15,000
mattress protectors / month

PROCESS

From raw material to finished product

Every product goes through five key steps in our plant.

  1. Material intake
    01

    Material intake

    Raw materials — fabrics, filling and thread — are received, inspected and sorted by quality.

  2. Processing
    02

    Processing

    Cutting and prepping the material for the next stages of production.

  3. Quilting
    03

    Quilting

    Machine-fixing of filling and precise quilting across the full surface.

  4. Final stitching
    04

    Final stitching

    Assembly, finishing and a quality check on every piece.

  5. Packaging
    05

    Packaging

    Packaging for delivery — private label available for hotels and brands.

QUALITY

Control at every step

Owning our filling and cutting means we oversee every step — from raw-material intake to finished, ready-to-ship product.

For hotels and brands we manufacture under private label: your logo, your packaging, our textile and quality.

We standardise weight, dimensions and materials to partner specifications — from economy to premium tiers.

Have a specific project?

Send us your specification and we'll respond within 24 hours.

Request a quote